INTERIOR SYSTEMS · QUÉBEC(514) 827-7500info@constructionldp.ca
Request a quoteEmail us
COMMERCIAL DRYWALL / INTERIOR SYSTEMS

Commercial drywall installation in Montréal and Laval

Construction LDP works on gypsum board scopes for commercial, institutional, industrial and multi-residential projects, following the drawings, specifications and prescribed assembly details.

Drywall scopes defined by your project documents

Gypsum systems vary by location, board type, number of layers, assembly requirements and finish level. We review these conditions with general contractors to clarify scope boundaries and coordination with adjacent trades before bidding.

01 / PARTITIONS

Gypsum board partitions

Board installation on specified framing, with attention to corners, openings and details shown on the drawings. Board types and installation sequence follow project specifications.

02 / ASSEMBLIES

Wall linings and special systems

Wall linings and specified acoustic or fire-rated gypsum assemblies, with attention to junctions, penetrations and system continuity.

03 / FINISHING

Preparation for finishing

Coordination of specified finish levels, joint treatment requirements and site conditions for gypsum surfaces.

What to include with a tender invitation

Current architectural drawings and specifications, partition schedules, wall heights, board layers, fire and acoustic details, openings, site access, project schedule and addenda. This information helps us review the exact scope being requested.

Areas served

Construction LDP serves Montréal, Laval, the Laurentians, Lanaudière and Trois-Rivières, and considers projects across Québec.

Common commercial drywall scope questions

How is a standard partition different from an acoustic or fire-rated assembly?

Wall schedules, specified board types and layers, junction details and assembly references establish the requirements. A performance rating cannot be inferred from board type alone.

Is taping and finishing automatically included in a drywall installation bid?

Not necessarily. Joint treatment, required finish level and preparation before painting should be expressly confirmed in the tender scope and contract documents.

Send drawings for a quotation

Request a quote